LEFTFIELD has been brought on at the end of Schematic design as the project seeks approval by the MSBA Board in August and from the City shortly thereafter. Waltham Public Schools, particularly under the leadership of Dr. Echelson, has demonstrated itself capable of providing a top-notch education - please ensure that it continues to do so by lending your support to the construction of a new high school building in whatever venues you can.

She currently works full time as a healthcare analyst. Additionally, the new high school should be built with sustainability in mind, incorporating the most up-to-date technology and energy efficiency standards. The City was invited by the MSBA in November 2015 to conduct a Feasibility Study. I can't think of a better person for the job as Bill is both a neighbor to the project and a supporter of the project. Waltham High School (current building at 617 Lexington St) Massachusetts School Building Authority Volunteer; Donate; Contact; About Kristine.

This page is meant to be a jumping off point of the "who." Residents are invited to ask questions and offer comment on the matter. Continued Placement of Concrete Slab on Deck in Building C. All Departments. The Massachusetts School Building Authority is planning to build a new building for high school students in Waltham. Waltham Public Schools.

The Waltham School Building Committee will hold two Community Meetings on the The Waltham High School Project at 554 Lexington Street, also known as the Stigmatine’s.

Completed Spray Fireproofing in Building A.

The Waltham School Committee and Waltham School Building Committee will hold a Neighborhood Meeting on the Waltham High School Project and its potential location at Chesterbrook Woods, a 25.5-acre parcel of land adjacent to the Robert Treat Paine Estate.

Waltham High School.

Continued Lateral Piping in Well Field #2 and Drilling in Geothermal Well-Field #3. BOSTON - State Treasurer Deborah B. Goldberg, Chair of the Massachusetts School Building Authority ("MSBA"), and MSBA Executive Director/Deputy CEO John K. McCarthy announced today that the MSBA Board of Directors voted to approve a grant of up to $118,373,814 for a project to replace the existing school with a new Waltham High School. Waltham High School. Waltham, MA.

Kristine Mackin moved to Waltham in 2009 to attend Brandeis University, where she completed a Ph.D. in biochemistry in 2014.

Both meetings will take place at the Waltham High School, Cannon Lecture Hall, 617…

Completed Under-slab Utility Installation in Building A and Continued in Buildings B & C/D. WALTHAM, MA — There have been dozens of public meetings in the past year as school officials work out a plan to build a new high school at 554 Lexington Street.

The Waltham project would exceed the nearly $200 million spent on Newton North High School, which became the state’s most expensive high school when it opened in 2010. Waltham City Council. A high quality educational program is one of the most important things a city can provide to its residents; although not all of us will send children through the Waltham Public School system, we all benefit from well educated young people who are given an education that meets their individual needs. The City of Lowell submitted a successful statement of interest to the Massachusetts School Building Authority (MSBA) for Lowell High School in April 2014.

LEFTFIELD has been retained by the City of Waltham as OPM to manage the design and construction of the new Waltham High School. Board of Cemetery Commissioners; Board of Health; Board of Library Trustees